Cross Green, Phases 1-3, Leeds

Project Details
Client: Towngate Plc
Architect: Kilmartin Plowman and Partners Ltd
Structural Engineer: Adept Consulting Engineers
Quantity Surveyor: Michael Eyres Partnership LLP
Principal Designer: Thornton Associates (Yorkshire) Limited
Value: £12.5 million
Category: Industrial / Logistics

The first phase consisted of the construction of two speculative warehouse industrial spaces totaling 117,500 sq ft with the two units ranging in size; Unit 1 is 55,000 sq ft and Unit 2 62,600 sq ft. 

 Caddick was awarded the contracts to design and build phases 2 and 3 of the scheme with phase 2 comprising the construction of a 55,000 sq ft speculative industrial warehouse and phase 3 construction of a 16,500 sq ft detached double portal framed unit. 

The units all include Grade A two-storey office accommodation, a secure car parking area, a concrete service yard with depths up to 50 meters and dock levellers and ground level loading bays. 

The high specification units were designed and will be built to a 'Very Good' rating under the latest BREEAM 2014 legislation. 

Cross Green, Phases 1-3, Leeds

Cross Green, Phases 1-3, Leeds

Cross Green, Phases 1-3, Leeds

Cross Green, Phases 1-3, Leeds

Cross Green, Phases 1-3, Leeds

The area I feel sets Caddick Construction apart from the competition is how you have overcome all the inevitable challenges throughout this development; practically, cost effectively and promptly, finishing the development of all 3 phases, £12.5m, on time and in budget.

Robert B Smith | Managing Director | Towngate Plc