Loading...

Alpla G84, Warrington

Project Details
Client: Alpla UK Limited
Architect: Pozzoni Architecture
Structural Engineer: Curtins Consulting Engineers
Quantity Surveyor:
Principal Designer:
Value: £1.8 million
Category: Industrial

The design and build of a new link bridge across Yew Tree Way to connect the existing GB2 unit with the recently acquired former Carlsberg distribution unit, which will be renamed as Alpla GB4. 

In addition, the works will include the redecoration of the East and part of the North elevations to the Alpla company branding, structural modification to the existing north elevation to introduce a new loading bay consisting of six dock levellers/ loading bays and service yard. 

Alpla G84, Warrington
 All Industrial Projects