Client: | Network Space Developments Ltd |
Architect: | DLA Design |
Structural Engineer: | Tetra Tech |
Quantity Surveyor: | Wakemans |
Principal Designer: | DLA Architecture |
Value: | £9.6m |
Category: | Industrial / Logistics |
Following the successful build of Tunstall Arrow Phase 1 we were awarded the contract for Phase 2. This development consisted of the design and construction of 5 industrial units ranging from 13,000 to 30,750 sq and 109,250 sq ft in total.
The units are modern portal-framed buildings with electronically operated loading doors with warehouse floor slab loading and eaves ranging from 8-10m in height. All have high-quality, fully fitted ground and first-floor offices and amenity areas with associated services.
Externally works include a landscaped environment, secure gated service yard and dedicated staff and visitor car parking spaces with electric charging points. All main services were included in the project.