Client: | Rigid Group Limited |
Architect: | Caddick Construction Ltd |
Structural Engineer: | John Allen Consulting Limited/ BJB Consultancy Limited |
Quantity Surveyor: | Grayspurr Limited |
Principal Designer: | Bank Smith Partnership/ Grayspurr Limited |
Value: | £9.9 million |
Category: | Manufacturing |
After outgrowing their existing facility, a 19 acre greenfield site was found just half a mile away, and construction began to create the 240,000 sq ft world class plant, equipped with the latest corrugator and materials handling system. Due to the success of Rigid, a second phase was negotiated with Caddick Construction. The 89,800 sq ft steel framed extension was constructed to house a new latitude case maker.